Building Permit Application Submittal | Demolition Construction Guidelines BUILDING PERMIT APPLICATION SUBMITTAL | DEMOLITION CONSTRUCTION GUIDELINES Complete the following checklist for the building demolition. Items that require an acknowledgement only mark with your initials. Items which do not apply, mark with "N/A" or not applicable. Completed permit application form with the required permit fee.Three (3) site plans clearly identifying the location and footprint square footage of the structure(s) being demolished.Acknowledge that the electrical service has been disconnected by the serving utility.Acknowledge that the gas service has been disconnected by the serving utility.When on-lot septic systems are present: (1) Tanks must be pumped. (2) any associated piping must be removed and properly disposed of, and (3) tanks must be removed and properly disposed of or abandoned in-place with holes punched in the tank bottom and filled with clean fill.When public sewer is present and the lateral is being abandoned: Laterals must be capped at the public main as directed by local sewer authority.On-lot wells to be abandoned shall have the pump removed: the shaft shall be filled with clean stone and permanently capped 12" below finished grade.Signature of Authorized Agent / OwnerDate MM slash DD slash YYYY